INCLUDES:
MEP:
Electrical
Plumbing
HVAC
Sprinkler System
CONCRETE:
Slab
Shaping for Seats
Sidewalk Allowance
**Not included: Site Prep, Parking Lot, Utility Hook Ups, Furniture, Fixtures & Sound System
|
FRAMING/INTERIOR FINISH:
Light Gauge Framing
Frame Connectors
Exterior Doors/Hardware
Interior Doors/Hardware
Paint/Texture
Millwork
Bathroom Partitions
FRP behind Fixtures
Acoustical Ceilings
Acoustical Treatments
Floors (stained & sealed) |
FINISH:
Wood Floor (Boston Parque)
Basketball Goals (4)
Lockers (Gym & Classroom)
Kitchen Equip. Allowance
Classroom Equip. Allowance
Gym Seating (1,100 seats)
GENERAL:
Temporary Facilities
Trash Hauling
Professional Fees:
Architect Fees
Construction Mgmt Fees |