Coating Price Sheet
Coating Price Sheet
| Coating Type | * Estimated Life | Description | Cost per S.F. |
|---|---|---|---|
| Paint – High Tensile Acrylic | 10 Years | 100% Acrylic Paint | $2.55 |
| Paint – Silicon Base Coating | 20-25 Years | Silicon Coating | $2.90 |
| Acrylic Stucco – Sprayed Finish | 10-15 Years | Synthetic Acrylic Stucco | $4.15 |
| Acrylic Stucco – Hand Trowel | 10-15 Years | Synthetic Acrylic Stucco | $5.60 |
| Polyurea | 25-?? Years | Polyurea | $5.70 |
| Ceramic Tile | 50-?? Years | Exterior Grade Tile, adhesively adhered | $6.15 |
| Sprayed Concrete | 50-?? Years | Reinforced sprayed concrete | $6.50 |
| Sprayed Concrete – Trowel Finish | 50-?? Years | Hand worked sprayed concrete | $8.15 |
| Metal Cladding | 50-?? Years | Enamel coated metal “shingles” | $7.70 |
| Cultured Stone | 50-?? Years | Cultured Stone, adhesively adhered | $14.00 |
Monolithic Stucco
| Coating Type | * Estimated Life | Description | Cost per S.F. |
|---|---|---|---|
| Monolithic Stucco not colored | 50-?? Years | Stucco w/o coloring | $2.25 |
| Monolithic Stucco colored | 50-?? Years | Stucco with concrete colorant added | $2.45 |
| Monolithic Stucco with Silicon coating | 50-?? Years | Stucco with 2 coats of a Silicon coating on the outside | $4.70 |
| Monolithic Stucco, supplied Silicon coating | 50-?? Years | Stucco, and we supply Silicon coating for you to apply | $3.10 |
*Estimated life spans are NOT a warranty. Any warranty provided by a product manufacturer will be passed through to the end consumer. Estimated life spans are based on field observation, and product system testing.
All systems include basic surface preparation and appropriate primers. All systems are installed according to product manufactures specifications.
Various color options are available for most coating systems. Special colors, patterns, textures, etc. may require an additional cost (varies by system).
All per square foot costs include: labor (usually including housing and travel expenses), construction materials, and “typical” equipment for each system. Some situations may require the use of additional equipment or labor which is an additional cost. Other localized factors may require a cost adjustment.
Detailed pictures and/or an on-site analysis will be required prior to a formal written proposal.