Javier Sprays Stucco on the 24’ dome that is on the same jobsite
Javier is on top of the building, getting ready to spray the Monoform Primer
Javier is applying the Monoform primer on the surface of the dome.
The Monolithic Stucco inside the Monolithic Concrete Mixer
Javier sprays the Monolithic Stucco on top of the dome using ropes tied to the man lift.
Javier sprays the Monolithic Stucco on top of the dome using ropes tied to the man lift.
Javier sprays the Monolithic Stucco on top of the dome from the manlift.
Application from the manlift is the best way to ensure that you have an even coat, and keep overspray falling down the dome instead of up onto the fresh concrete.
The GHP 2500 was used to pump the concrete over the long distances. We used the pump to spray half the dome, then moved the pump to the other side of the building.
Javier also sprayed the stucco on a 24’ dome that was on the same property.
Ariel view of the 24’ dome completely sprayed with the green Monolithic Stucco.